Author: Cris Crawford
RF Signal Generator, 300-1000 MHz
Technical Data: Standard Signal Generator, Model 84
Misc Info: http://www.radiomuseum.org/r/measurem_standard_generator_84.html
User Manual:
Leased By: David K.
Safety Considerations:
Certification Process:
Notes: Currently stored off-site.
Z-Y Bridge
Technical Data: General Radio, model 1603A
User Manual: GR 1603A Manual
Manufacturer Web Site: http://www.ietlabs.com/genrad_history/historic_appnotes/
Leased By: David Kent
Safety Considerations:
Certification Process:
Other resources:
Flexible Shaft Tool
Technical Data: Foredom flexible shaft tool
User Manual:
Manufacturer Web Site: http://www.foredom.net/
Leased By: David Kent
Safety Considerations:
Certification Process:
Other resources:
Power Supply, Dual, 0-20VDC, 0-1.7A
Technical Data: Lambda LPD-421-FM, Dual supply, 0-20V, 0-1.7A adjustable
User Manual: http://exodus.poly.edu/~kurt/manuals/manuals/Other/LAMBDA%20LPD%20Series%20421AFM,%20422AFM,%20423AFM,%20424AFM,%20425AFM%20Operation.pdf
Leased By: David Kent
Safety Considerations:
Certification Process:
Balance
Technical Data: Ohaus
Manufacturer web site: http://us.ohaus.com/en/home/products/product-families/HVD-US.aspx
User Manual: http://dmx.ohaus.com/WorkArea/showcontent.aspx?id=4260
Leased By: David K.
Safety Considerations:
Certification Process:
Kiln – Raku
The Raku process needs more heat than an electric kiln can typically provide. This kiln has been reworked by the Framingham makers to run with a high-volume, high-heat propane burner and is fuelled with a tank which is larger than the typical home grill propane tank. Firing the clay for the Raku project is an outdoor event, so firings will be scheduled for the warmer months. In addition to the kiln, the Raku process requires smoke generated from one of several combustible materials when the fired project is put into a tightly closed metal bucket.
Technical Data: Discarded electric kiln modified for propane use. Venturi propane burner (MR-750), 152,000 BTU with adjustable high pressure regulator
User Manual: (Locally written?)
MFG Web Site: MR-750 venturi burner
Leased By: Owned by Framingham Makerspace
Safety Considerations:
All firings will be scheduled events because of the very high heat involved, and will be done at a location outside the makerspace facility.
Certification Process:
All participants will need to work with the Raku activity group.
———-
Read and view the material at the following links to help you prepare for using the Raku process.
- Wikipedia Article (Raku background to get you started)
- The Potter’s Shop and School (Needham, MA studio which helped Framingham makers get started)
Stick Welder
Technical Data: Lincoln AC/DC 225/125
- Power Consumption: AC/DC stick 220VAC/1PH
User Manual: User manual for a similar model
Leased By:
- David K.
Safety Considerations:
Certification Process:
Kiln – 4400W Pottery
Technical Data:
- Power Consumption: 220VAC/1Ph, 4400Watts
User Manual:
Leased By:
- David K.
Safety Considerations:
Certification Process:
Notes: Currently stored off-site.
Framingham Makerspace awarded $101,017 grant from Mass Development
Framingham Makerspace awarded $101,017 grant from Mass Development
Framingham Makerspace was awarded $101,017 from the Massachusetts Development Collaborative Workspace grant program. Thanks to Charlotte Maynard Managing Partner of Saxonvill Realty Trust for providing much needed support for the grant applicaiton. Here is a link to the perss release Mass Development Collaborative Workspace grant awards.